
Add to Cart
4 cavities Fully Automatic PET bottle blow machine and water bottle manufacturing machine price with injection molding
Production:
Technical Parameters:
Model | Unit | MW-D5L4 | |
Clamping System | Cavity Quantity | cavities | 4 |
Clamping Force | KG | 65000 | |
Mold Stroke | mm | 200 | |
Stretching Rod Stroke | mm | 360 | |
Stretching Rod Dia. | mm | 14 | |
Bottom Mould Stroke | mm | 50 | |
Pitch Distance | mm | 190.5 | |
Preform Holder Quantity | PCS | 90 | |
Container Spec. | Max.Container Volume | ml | 5000 |
Max.Container Height | mm | 320 | |
Max.Container Diameter | mm | 180 | |
Max Preform Height | mm | 160 | |
Max.Neck Diameter | mm | 45 | |
Output | BPH | 3000-4000 | |
Electrical System | Heating Oven Quantity | Zone | 4 |
Number of Lamp | PCS | 4*12 | |
Heating Power | KW | 85 | |
Installed Power | KW | 110 | |
Voltage | Voltage | Customized | |
Actual Power | KW | 48 | |
Air System | Operating Pressure | Mpa | 0.7-0.9 |
Blowing Pressure | Mpa | 2.5-30 | |
High Pressure Air Consumption | L/min | 5.0/40 | |
Chiller System | Temperature Range | Degree | 9-13 |
Pressure | Mpa | 0.4 | |
Capacity | HP | 10 | |
Machine | Machine Dimension | M | 4.5*2.1*2.2 |
Machine Weight | KG | 5500 |
One Year Free Charge Spare Parts List
No | Item | Qty |
1 | Infrared lamp | 10pcs |
2 | Stretch cylinder sealer | 4pc |
3 | HP Air pipe | 10m |
4 | LP Air pipe | 10m |
5 | Sealing cylinder seals | 4pcs |
6 | 24V magnet valve coil | 2pcs |
7 | Robot clip | 4 PAIRS |
8 | Magnetic switch | 1pc |
9 | Preform holder | 4SETS |
10 | Approximity Sensor | 1pc |
11 | High pressure reducer valve | 1pc |
12 | Low Pressure Air Pipe | 15m |
13 | Air Connector | 20pcs |
14 | Instruction | 1pc |
15 | Anti-rust painting | 1bottle |
16 | Temperature controller module | 1pc |
17 | relay 24V | 1set |
18 | Tool box | 1set |
19 | Inner hexagon spanner(4,6,8,10,12) | 1set |
20 | Solid wrench(8,10,12,13) | 1pc for each |
21 | Slot type screwdriver(3inch, 4inch) | 1pc for each |
22 | Phillipe screwdriver(3inch, 4inch) | 1pc for each |
23 | Machine foot M16 | 6pcs |
Installation:
Our engineer will travel to buyer’s country within 10-20 days after receipt of confirmation in the written form from client informing that the goods arrived in site and civil works is ready for installation. The client has to buy round tickets and arrange all local facilities including food, lodging, and transportation during their staying period in buyer’s country. The buyer would pay USD 120/day for each engineer during journey.
Warranty:
One year from the date of Installation or acceptance of the Plant whichever comes first.
Note:
If the client needs our manufacturer to provide the training program depending on the experience of the local people and the client requirement as the local people has no experience in this kind of plant, the client has to send their people (about 4 technical engineers/workers) to China